Cement complex fulfils monthly plan

January 31, 2026

The Sangwon Cement Complex carried out its national economic plan for January ahead of schedule.

The complex conducted frontline-style political work in an accurately-targeted way and took timely measures to solve problems arising in production and operate equipment in each system at full capacity.

Workers and technicians at the calcination workshop in charge of the main production process made the most of rational furnace operation methods in keeping with the unfavourable seasonal conditions and carried out the repair of kilns and coolers in a substantial way, thereby laying a reliable foundation for the revitalization of production.

The Sangwon Limestone Mine, Ilchulbong Mine, Samchong Mine and Hwachon Coal Mine set up an efficient system for the maintenance and repair of mining equipment and heavy duty lorries and conducted a socialist emulation drive at each unit and thus carried out plans every day.

KCNA

2026 © All rights reserved. www.pyongyangtimes.com.kp